Projects
A Zanbase project organizes work into milestones, cycles, and tasks — and shows that work however the team thinks best. The same tasks render as a board, a table, a calendar, or a timeline.
One set of work, many views
Switch views without copying data. A task you move on the board updates everywhere, because every view reads the same underlying rows in real time.
- Milestones and cycles to structure delivery
- Board, table, calendar, and timeline views
- Tasks linked to docs and tables in the workspace
- Live updates and presence as the team works
Connected to everything else
Projects share the workspace permission model and substrate. Link a project to the spec doc that drives it, pull data from a table, or discuss a task in a thread — without leaving the workspace or reconciling separate tools.
Open a workspace and start a project.